Tujuan
-
Menjelaskan dasar engineering pada heavy lifting & heavy transportation
-
Mengidentifikasi crane, lifting equipment, dan heavy transport equipment yang sesuai untuk berbagai operasi onshore/offshore.
-
Menyusun lifting plan dan transport plan
-
Melakukan perhitungan dasar engineering: CoG, load distribution, sling tension, allowable deck load, stability check.
-
Mengidentifikasi dan mengendalikan risiko operasi lifting & transport
-
Menerapkan prosedur keselamatan dan komunikasi kritis selama operasi lifting dan loadout.
-
Menyelesaikan analisis kasus gangguan (troubleshooting) dalam operasi lifting berat.
-
Mempresentasikan rencana heavy lifting
Target Peserta
-
Lifting Engineer / Rigging Engineer
-
Construction Engineer & Supervisor
-
HSE Engineer khusus area lifting operation
-
Marine Engineer / Naval Architect
-
Project Engineer (EPC, konstruksi, migas, industri berat)
-
Logistic & Transport Specialist
-
Crane Operator (level senior)
-
SPMT Operator / Heavy Haul Specialist
-
QA/QC Engineer terkait lifting & transport
Silabus
MODULE 1 – Introduction to Heavy Lifting & Transportation-
Definisi heavy lifting & heavy haulage
-
Onshore vs offshore lifting challenges
-
Overview heavy-lift marine operations
-
Kategori equipment dan aplikasi industri
-
ASME B30 series
-
DNV-ST-N001, DNV-ST-0378
-
LOLER, OSHA
-
Project-specific and client-specific requirements
-
Center of Gravity (CoG) calculation
-
Load distribution
-
Sling angle effects & tension calculation
-
Shackle, sling, spreader bar, lifting beam selection
-
Dynamic loading (marine operation)
-
Crawler crane, tower crane, mobile crane
-
Floating crane & sheerleg crane
-
Crane load charts & derating factors
-
Offshore lifts: heave, wind, vessel motion
-
Inspection & certification
-
Lift points design & padeye calculation overview
-
Lifting lugs, hooks, wire rope, chain sling
-
SPMT (Self-Propelled Modular Transporter)
-
Multi-axle trailer
-
Route survey & load spread analysis
-
Ground bearing pressure calculation
-
Bridge crossing considerations
-
Barge selection & ballasting
-
Loadout by SPMT / skidding system
-
Sea fastening design basics
-
Stability criteria for marine transport
-
Offshore lift phases (hook-up, splash zone, wave effect)
-
Dynamic amplification factor
-
Heave & wind loads
-
Anchor & mooring requirement
-
Lifting plan & method statement
-
Critical lift analysis
-
Transport plan preparation
-
Interface management dengan kontraktor lain
-
HIRA & JSA untuk heavy lifting
-
Exclusion zone & barricading
-
Critical communication protocol
-
Emergency response
Fasilitas
- Makan siang dan rehat kopi.
- Diskon khusus bila mendaftar dalam grup, terdiri dari 3 orang atau lebih.
- Sertifikat kehadiran dari penyelenggara.